"Your Construction Partner"
             Since 1970
 


KNOXVILLE BRANCH

Doug Edwards 1-865-983-4906 dedwards@icmmail.com
  ICM E-Biz Online Store now Open  
HOME PAGE   SITE MAP CONTACT US COMMENTS BRANCH  LOCATIONS

ABOUT ICM

ICM News Page
Used Equipment
Email ICM
Construction Info
 & Link Page
Employment


We Accept

Backfilling Info

Backfilling Around Pipe:   DO           
Approved backfill material should be placed carefully along the pipe and compacted under the haunches. Materials should be brought up evenly in layers on both sides of the pipe and to one foot above the top of the pipe.
Backfilling Around Pipe :  DON'T
Backfill material should not be bulldozed into the trench or dropped directly on the pipe. Material should be placed in such a manner so as not to displace or damage the installed pipe.
Final Backfill :  DO
Backfill material should be readily compactable, job excavated material and should not contain large stones, boulders, frozen lumps or other objectionable material. Backfill should be placed and compacted in layers as specified.
 
April 24, 2009 Copyright © 2001 ICM EBiz Division.  ebiz@icmmail.com  We Specialize in building Construction Oriented Web Sites